One Post per Table
A single pile-driven post carries each panel table — a fraction of the foundation points of multi-post systems. Fewer points means fewer pile-driving shifts, less steel in the ground, and a faster path to a finished array.

A single-post ground mount for utility-scale solar. One pile-driven post carries each panel table — no concrete, a fraction of the foundation points, and snap-on clamps that cut panel installation time by up to 30%.
On a large solar farm, the schedule is won or lost at the foundations. Terra SP is a single-post ground mount solar racking system that puts one pile-driven post under each panel table — a fraction of the foundation points of a multi-post system. Fewer points means fewer pile-driving shifts, less steel in the ground, and less ground disturbance across the array.
Installation follows a simple sequence: drive the post, mount the pre-assembled table structure, snap the panels on. Posts go straight into the ground with no concrete and no curing wait, on flat land, gentle slopes, and farmland alike. Above ground, the structure is aluminum — light to carry and naturally corrosion-resistant. Below, the post is steel, sized to carry a full table on a single support. Snap-on clamps secure each panel without special tools and cut panel installation time by up to 30%.
Terra SP mounts utility-scale solar farms worldwide, and every project is engineered to its site: wind and snow loads are calculated per location and verified to JIS C 8955, ASCE/SEI 7 and IBC, or Eurocode EN 1991. Megawa Solar backs the system with a 12-year warranty and a 25-30 year design life. Send your site layout and target capacity, and our engineers will design and quote the array for your project.
A single pile-driven post carries each panel table — a fraction of the foundation points of multi-post systems. Fewer points means fewer pile-driving shifts, less steel in the ground, and a faster path to a finished array.
Posts drive straight into the ground. No digging, no concrete, no curing wait — foundations are ready for the structure the same day, on flat land, slopes, or farmland.
Snap-on mid and end clamps lock each panel to the rail without special tools, cutting panel installation time by up to 30% across thousands of modules.
The load-bearing post is steel; everything above it is aluminum. Crews handle light, corrosion-resistant parts all day, while the single support below is sized to carry the full table.
| Material | AL6005-T6 aluminum / Q235B steel post |
|---|---|
| Panel Orientation | Portrait / Landscape |
| Design Tilt | 0° to 30° — fixed per project design |
| Ground Clearance | Designed per project — no fixed limit |
| Post Type | Single post, pile-driven |
| Foundation | Pile-driven · ground screw · concrete |
| Installation Site | Flat · slope · agricultural land |
| Snow Load | ≤ 1.4 kN/m² |
|---|---|
| Wind Load | Engineered per project — structural calculation per site |
| Module Types | Framed / frameless |
| Design Life | 25-30 years |
| Warranty | 12 years |
| Design Codes | JIS C 8955 (JP) · ASCE/SEI 7 · IBC (US) · Eurocode EN 1991 (EU) |
Itemized BOM, unit pricing and lead time — engineering reply within 24 hours.